941 S MATTHEW WAYPermit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2019-02054
Issued:05/10/2019
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 215
Site Address: 941 S MATTHEW WAY
Legal Description: N TR 12686 LOT 55
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: Refurbishment of kitchen and bathrooms with tile around shower area. Plumbing for
whole house repipe using pex. Mechanical to replace and relocate air conditioner with coil (to the side of the house) furnace,
(10) ducts and electrical for disconnect.
Valuation:
$3,500.00
Construcion Types:
N/A. .
Fire Spdnklered?
No
Cool Roof
No
Total Fees paid for Permit:
1.492.50
People Associated with Project:
Owner SAGAR YOGESH VIRA 941 S MATTHEW WAY ANAHEIM HILLS CA 92808-1461
Contractor M K D CONSTRUCTION 8502 E CHAPMAN 177 ORANGE CA 92869 0000
Permit Applicant MOE KARIMI
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty
Receptacle, switches, lights
123 Shower 2
Motors - Factory Wired Appliance, up to 1
1 Lavatory 3
h.p.
Water Closet 2
Kitchen Sink 1
Garbage Disposal 1
Repair/Drainage AlterationNent Piping 1
Dishwasher 1
Bar Sink 1
Water Distribution 1
Type Mechanical Fixtures
Residential Registers
Heating/Cooling Coil
Heating Appliances, including vent
Compressor/Boiler - up to 15 hp
Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
10
1
1
1
aPVA P4 �,
Cityof Anaheim g4 P `��
BUI)dltl9 D!V(S)OIT f i
>
�O`�'pED tag^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOK
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
6r—
Plumbing Final
Mechanical Final i,y 141 L' k'
Cross Connection Control (714) 765-4280
#C_
Engineering Final (714) 7655126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041 I
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LlstSus. Lic. (714) 7655194 (AII 1 ass )
Setback/Fonnsrrrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 7655153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
a9Si3 /9 QddAlk
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Relnf.)
Floor (JoisVGirders)
Aw- j
Underfoor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
,. _ q
2nd Floor (Floor Nailing)
Do not cover or cone --s work below until the following applicable items have
1st Floor Shear
Firesprinkler(Rough) (Fire Dept)
Mechanical Inspections ,�,.,.,,
„/- pj� ¢ c_.�} rr�¢ 0(,4 k7)y
2nd Floor Shear
plan ]rq
PC
Roof (SheathinglDiaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
IR Ig
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Ra-
Rough COA/Mitagatlon Measures
Plumbing Inspections V
Framing , after Plbg_ Ele., Mec. 8 Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
"7/
p2
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
72\ v 17,
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service