Loading...
941 S MATTHEW WAY (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2020-00335 Issued: 01 /24/2020 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 215 Site Address: 941 S MATTHEW WAY Legal Description: N TR 12686 LOT 55 Project Description: Residential Remodel: 9,000 sq ft of stucco around house. People Associated with Project CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 • 5153 Valuation: $15,000.00 Construcion Types: WA, , Total Fees paid for Permit: 3,920.95 Owner SAGAR YOGESH VIRA 941 S MATTHEW WAY ANAHEIM HILLS CA 92808-1461 Contractor BUILDER BOY INC 1819 REDONDO AVE SIGNAL HILL CA 90755 0000 Permit Applicant BERIL URAL Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. I , ,-11 P�PNEIM C7< City of Anaheim O� iO Building Division r' Z u > �OVNDBO j Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final n Plumbing Final Mechanical Final NOT T ' Cross Connection Control (714) 765-4280 Engineering Final (714) 765.5126 j1a,T `; INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been sigma Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwmg applicable items have been s,Qned. Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (only after Rho Fie Mec & Fre: Insulation (Sound/Energy) Do npt tape >r plash,i until the following applicable itcm5 have been Signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath 12 / Jal2 Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor I f, Sewer Water Engineering Backflow (Testable Only) Water Service