Permit Number: BLD2019-03962
Issued:10/03/2019
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 215
Site Address: 941 S MATTHEW WAY
Legal Description: N TR 12686 LOT 55
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: Remove chimney and fireplace to be replaced with new prefabricated fireplace With
vent. Enlarge (6) openings and changeout (17) retrofit openings. Structural for new posts and headers.
Valuation:
$40,000.00
Construcion Types:
Vs. ,
Fire Spnnklemdl
No
Total Fear paid for Permit:
1.837.94
People Associated with Project
Owner SAGAR YOGESH VIRA 941 S MATTHEW WAY ANAHEIM HILLS CA 92808-1461
Engineer MOHSSEN KARIMI 8502 E CHAPMAN #177 ORANGE CA 92869
Contractor M K D CONSTRUCTION 8502 E CHAPMAN 177 ORANGE CA 92869 0000
Permit Applicant MOE KARIMI
Type Electrical Fixtures Oty Type Plumbing Fixtures City Type Mechanical Fixtures Qty
Receptacle, switches. lights 1 Gas System (1-5 outlets) 1 Factory Built Fireplace Chimmey 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
Np,NEIM C.d
Cityof Anaheim p� `'O
Building Division i
OVA'DEV tbq^
Do not occupy this building until the final inspections have be,-,..ade.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
S�
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items ha: -
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Eleetrode/Ufer
Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklFormsITrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follvhng applicable items have been
-sioned
Building Final (714 765-51W)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
;a 0?; /
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
02J�nS �.
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been slanted
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
tl/r4%g - t-:.. <>xd -.�.�d rc. -5a ¢o•La..i� a+wc i
2nd Floor Shear
n w I
�'
Roof(Sheathing/Diaphragm/Frame)
ra+?
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
2 I
ow
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
/3f'
Rough COA/Mitagatlon Measures
Plumbing Inspections
\ 1
Framing (Only after Plbg., Ele_, Mec. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed
Drywall
1
Drywall Penetrations (Ele, Mec 8. Plbg)
Interior Lath
12�r71i t<
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struts., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service