Permit Number: BLD2020-02151
Issued: 06/15/2020
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 134
Site Address: 502 S STEHLEY ST
Legal Description: N TR 3959 LOT 21
CITY. EIM
FUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Tear off existing material and install 3,100 square feet of composition shingles onto house and
attached garage.
Valuation: $12,400.00
Construcion Types: N/A, ,
Total Fees paid for Permit: 362.61
People Associated with Project
Owner FRANK SIMS SR 502 S STEHLEY ST ANAHEIM CA 92806-4434
Contractor CUT ONCE REMODELING 22828 LOCKNESS AVE TORRANCE CA 90501 0000
Permit Applicant MIGUEL VEGA
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbtd_permd_combo
P�PNEtM `
Cityof Anaheim C iO
Building Division F i
u a
-obNDED �^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
r
Cross Connection Control (714) 765-4 '—
il
'
Engineering Final (714) 765-5126 T Cv i`
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041r --
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
JCOAIMigartion Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed.
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
i /a
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing jOr% after Rod- Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days alter approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service