Loading...
908 S EMILY STPermit Types BLD 1 ELE MEC PLM X Permit Number: BLD2023-02755 Issued: 06/05/2023 www.anaheim.net/bu (ding (714)765-4626 Quarter Section: 82 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 17141 765 - 5153 Site Address: 908 N EMILY ST, ANAHEIM, CA 92805 Legal Description: N TR 304 BLK 6 LOT 1 APN: 03506307 Project Description: Electrical for 100 amp main service panel upgrade Living Area: Number of Stones: 1 Valuation: 000 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 278.00 People Associated with Project: Contractor LOI VAN HUYNH 8681 MC FADDEN AVE202105051647093484 WESTMINSTER, CA 92683 Permit Applicant LOI V HUYNH 8681 MCFADDEN AVE WESTMINSTER, CA 92683 0000 Owner DINH. HUNG X TR H X DINH 9142 SHERIDAN DR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Oty Meter/Disc Sw - Under 600 V, up to 200 1 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. P�PNEIM ��< Cityof Anaheim OF iO Building Division fF - • DUNDED t8y1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4691 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormslTrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sion Building Final (714 765-5163) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirdeis) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor iDo not hackf 11 unless ginned off) Sewer Water Engineering Backflow (Testable Only) Water Service