Permit Number: BLD2017-03420
Issued:11/08/2017
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 64
Site Address: 614 S PORTO PL
Legal Description: N TR 2152 LOT 59
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Addition: Construct 138 sq. ft. addition to extend master bedroom and bathroom.
Valuation:
Conti ucion Types:
Fire Sprinklered?
Cool Roof
Total Fees paid for Permit:
People Associated with Project
$20,000.00
VB,
No
No
1.622.66
Owner CYNTHIA GAIL BLINN 22906 HUNTER CREEK MISSION VIEJO CA 92692-4745
Engineer MOKSUDUR RAHMAN 6939 SCHAEFER AVE D-170 CHINO CA 91710
Permit Applicant TIM BLINN
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures City
Meter/Disc Sw - under 600 V, up to 200
amps
Receptacle, switches, lights
1 Shower
Lavatory
11 Water Closet
Repair/Drainage AlterationNent Piping
Water Distribution
Sewer per 100 ft.
1 Ventilation Fan - <= 300 cfm on single duct 2
1
1
1
1
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
P�PNEIM c�`
City of Anaheim of iO
Building Division F Z\I
>i
�OONDEp
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final —r "a
`-"
Plumbing Final 13 Ptr'ty
S t •J
'
��
Mechanical Final �y.� V r
", r
I
Cross Connection Control (714) 765-4260
Engineering Final (714) 765-51
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
----
Do not po,i• concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Was
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
7 a 12
A. ,
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
q 2l
IYa
PJolti
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical (
(�
Rough COA/Mltagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire) ),
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have br
asigned'
Drywall
(�
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath 7
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
twsiness days after approval) Excludes New
Exterior Plaster (Brown Coat)
/ t 4 t
• .� h„
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service