Loading...
923 S PARK CIRFermit Types BLD ELE MEC PLM X Permit Number: BLD2020-01405 Issued: 04/09/2020 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 48 Site Address: 923 S PARK CIR Legal Description: TR 3266 LOT 20 FOR OF LOT CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: remove existing material, resheath as necessary and install (35) squares of composition shingles onto property. Valuation: $34,000.00 Construcion Types: N/A, , Total Fees paid for Permit: 371.52 People Associated with Project Owner BOND, MICHAEL JR TR FBO 18971 FLAGSTAFF LN HUNTINGTON BEACH CA 92646-1931 Contractor LAC ROOFING INC 15441 CACTUS ST HESPERIA CA 92345 0000 Permit Applicant LUIS CONTRERAS 15441 CACTUS ST HESPERIA CA 92345 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. Paf,N EIM Cd< Cityof Anaheim O4 iO Building Division i u i �OVNDEp tss^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 766-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Formalfrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned- Building Final (714 765-6153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) 30 20 —, Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service