920 S NUTWOOD ST 9-15APermit Types
BLD 1 ELE MEC PLM
X
Permit Number: BLD2022-03339
Issued: 07/2212022
w .anaheim.neUbuiIding
(714)765-4626
Quarter Section: 48
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 920 S NUTWOOD ST 9-15A, ANAHEIM, CA 92804
Legal Description: S TWP 4 RGE 10 SEC 17 SEC 17 T 4 R 10 N 380 FT SW1
APN: 12829134
Project Description: Reroof: Remove existing material, resheath as necessary and install (38) squares of composition shingles for units
# 9-15
Living Ares: Number of Stories: 1 Valualicn:
Garage Area: Constructon Types:
Carpon Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fws paid for Perma:
People Associated with Project:
Contractor ABSOLUT ROOFING INC P O BOX 5262200005021155333920 HUNTINGTON BEACH, CA 92708
Pennit Applicant Sarah Hammarstrom
Owner RETIREMENT SECURITY COMPANY 115 N RESH ST
14,650.00
N/A
365.10
Type Electrical Fixtures Cry Type Plumbing Fixtures City Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
Paf,HglM C�`
Cityof Anaheim O� iO
Building Division F i
�ovNOEV ts�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
ICOAJMigatlon Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Ins ections1/� [/-
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistIGirders)
�.
Underfloor Insulation (Raised Foundation Only)
7/
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable hems have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service