860 S DUNE ST (2)Permit Types
BLD ELE MEC PLM
x
Permit Number: BLD2023-01441
Issued: 03/27/2023
www.anaheirn.ret/building
(714)765.4626
Quarter Section: 124
Site Address: 860 S DUNE ST, ANAHEIM, CA 92806
Legal Description: N TR 3796 BLK LOT 3
APN: 25338101
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 766 - 5153
Project Description: Reroof: Remove existing material, resheath as necessary and install (34) squares of composition shingles and (5)
squares of BUR on to house and attached garage.
Living Area: Number of Stones: 1 Valuation:
Garage Area'. Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Root. Total Fess paid for Permit:
People Associated with Project:
Contractor CUT ONCE REMODELING 22828 LOCKNESS AVE201910281527353520 TORRANCE, CA 90501
Permit Applicant Miguel Vega
Owner VAYDA TERESA ANN & RANDY 860 S DUNE ST
15,600.00
NIA
363.03
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
Paf,HEIM C�<
City of Anaheim OF iO
Building Division F Z
>
�DUNDED ts)^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklFormsfTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
/�
!M�/�
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been stoned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
_21
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service