Loading...
860 S DUNE ST (2)Permit Types BLD ELE MEC PLM x Permit Number: BLD2023-01441 Issued: 03/27/2023 www.anaheirn.ret/building (714)765.4626 Quarter Section: 124 Site Address: 860 S DUNE ST, ANAHEIM, CA 92806 Legal Description: N TR 3796 BLK LOT 3 APN: 25338101 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 766 - 5153 Project Description: Reroof: Remove existing material, resheath as necessary and install (34) squares of composition shingles and (5) squares of BUR on to house and attached garage. Living Area: Number of Stones: 1 Valuation: Garage Area'. Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Root. Total Fess paid for Permit: People Associated with Project: Contractor CUT ONCE REMODELING 22828 LOCKNESS AVE201910281527353520 TORRANCE, CA 90501 Permit Applicant Miguel Vega Owner VAYDA TERESA ANN & RANDY 860 S DUNE ST 15,600.00 NIA 363.03 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Cry The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. Paf,HEIM C�< City of Anaheim OF iO Building Division F Z > �DUNDED ts)^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormsfTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed /� !M�/� Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) _21 Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service