309 N SUNKIST STPermit Types
BLD MEC PLM
X ELE
Permit Number: BLD2024-04208
Issued: 08/13/2024
www.anaheim.net/building
(714)7654626
Quarter Section: 112
Site Address: 309 N SUNKIST ST, ANAHEIM, CA 92806
Legal Description: N TR 2569 BLK LOT 2
APN:08338417
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Reroof: Remove and install (31) sq of composition shingles over house and attached garage.
Living Area: Number of Stones: t Valuation:
Garage Area: Consauoion Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Contractor ONE STOP DEVELOPMENT INC 5377 HERITAGE OAK DR PORTOLA HILLS, CA 92679
Permit Applicant Conrad Chaps
Owner SNELL, RACHEL TR THE 2227 VIKING AVE
20,000.00
N/A
374.60
Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNf, 4EIM c-q`
City of Anaheim
Building Division i
U '
�O�A'DED tga
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the foilwing applicable items have been
signed
Building Final (714 765-5153)
last Inspection -Final Only After Above Completed
It
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
nd Fl
2Roo
heathin iaphragmtFa
Ma nf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation(Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service