Loading...
516 N STATE COLLEGE BLVD (7)Permit Types BLD ELE MEC PLM X X X Permit Number: BLD202043743 1 / Issued: 07/18/2022 www. anahei m. net1bu ild i ng (714)765-4626 Quarter Section: 112 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 516 N STATE COLLEGE BLVD, ANAHEIM, CA 92806 Legal Description: TR 1246 LOT 10(AND ALL -EX N 30 FT- APN: 08301348 Project Description: Tenant Improvement: Install new walk-in cooler for "Tacos El Patron". Living Area: Number of Stories: 0 Valuation: 10,000.00 Garage Area: Construction Types: va CarportArea: occupancy Groups: Balcony / Deck Area: Fire Spnnklered: No Cod Roof: Total Fees paid for Permit: 1,206 80 People Associated with Project: Permit Applicant ED FLORES Owner VEERAVAT SURAPRUIK TR 2232 MONTGOMERY CIR PLACENTIA, CA 92870 Engineer - Civil HAROLD PING HUNG WU 1168 SAN GABRIEL BLVD STE P 200006281115056750 ROSEMEAD, CA 91770 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Qty Motors - Factory Wired Appliance, up to 1 2 Compressor/Boiler- up to 15 hp 2 h.p. Receptacle, switches, lights 6 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. �NPI�EIM - Cityof Anaheim O� iO Building Division F i 10VNOEo 1-1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final I` I / EX IREE) Mechanical Final Cross Connection Control (714) 7654001 C Ip MP Engineering Final (714) 765.5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed- Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacWFormslrrenches (Footings) COA/Migatlon Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reiri Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only alter Plbg. Ele Moc & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed' Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service