801 1/2 N SABINA ST BPermit Types
BLD
ELE
MEC
FILM
X
X
X
X
Permit Number: BLD2021-03619
Issued: 10/26/2021
ww,iv.anaheim.net/bui1dlng
(714)765-4626
Quarter Section: 82
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
Site Address: 801 112 N SABINA ST B
Legal Description: N TR 530 BLK A LOT 27
APN: 03514114
Project Description: (ADU) Residential Addition: Convert 728 sq.ft detached garage into accessory dwelling with (2) bedroom, bathroom,
living room and kitchen.
Living Area: 728 Number of Stories:
2 Valuation: 10.000.00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered'.
Cool Roof:
Total Fan paid for Permit: 2.697.30
People Associated with Project
Pennb Applicant Jack Madrid
Owner BABAKA SAADATI 5026 HILL ST LA CANADA, CA 91011
Engineer - Civil BAO D PHAM 13902 HARBOR BLVD STE 2A 201311211620588540 GARDEN GROVE, CA 92843
Type Electrical Fixtures Qly Type Plumbing Fixtures Oty Mechanical Fixtures Dry
Receptacle, switches, lights 46 Garbage Disposal 1 Compressor/Boiler - up to 15 hp 1
Gas System (1-5 outlets) 1 Heating Appliances, including vent 1
Kitchen Sink 1 Heating/Cooling Coil 1
Ventilation Fan - <= 300 ofon single duct 2
Lavatory 1
Repair/Drainage AlterationNent Piping 1
Sewer per 100 ft. 1
Shower 1
Water Closet
Water Distribution
Water Heater
Water Main per 100 ft.
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�ptActM �7<
Cityof Anaheim OF !eO
Building Division F y
u >
�OUNDEO vI
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.6126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7655041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned-
Building Final (714 7654163)
Last Inspection -Final Only After Above Completed
r
IJ
I610
Plumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
beer sianed
lot Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele.. Mec. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Motor -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service