621 N PHILADELPHIA ST (2)Permit Types
BLD 1 ELE MEC PLM
X
Permit Number: BLD2024-00539
Issued: 01/31/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 82
CITY OF ANAHEIM
Site Address: 621 N PHILADELPHIA ST, Anaheim, CA 92805
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765. 5153
Legal Description: N TR 135 BLK 2 LOT 7
- -' - - --- _� .-„ - :•. ,: -
APN:03509708
Project Description: Reroof: remove and install (1361) sq of composition shingles over the entire garage
Living Area: Number of Stories:
t Valuation: 15,000.00
Garage Area:
Construction Types: NIA
Carport Area:
occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fees paid for Permit: 353.20
People Associated with Project:
Contractor DIAZ TOP ROOFING SERVICES
2051 E CERRITOS AVE #8C ANAHEIM, CA
Permit Applicant EVER DIAZ
7 SORENSON IRVINE, CA 92602
Owner AHMAD KHANJAN LLC
24881 LUNA BONITA DR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PN14 Cqt
City of Anaheim ,
Op io
Building Division ? i
u a
�OVND EO t8hn
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do riot pour concrete .,," 'he following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do r, iollwing applicable items have been
_
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
�16'Zy
TQI r
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler(Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMftagatfon Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set wthln 7 1
business days after approval( Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service