Loading...
617-619 1/2 N PHILADELPHIA ST (2)Permit Types BLD1 ELE MEC PLM X Permit Number: BLD2024-00538 Issued: 01/31/2024 www.anaheim.netibu ilding (714)765-4626 Quarter Section: 82 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Site Address: 617-619 112 N PHILADELPHIA ST, Anaheim, CA 926 Legal Description: N TR 135 ELK 2 LOT 7 APN: 03509708 Project Description: Reroof: Remove and install (3409) sq of composition shingles over the entire complex Living Area: Number of Stories: 1 Valuation: 16,000.00 Garage Area: Construction Types: WA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered Cool Roof: Total Fees paid for permit: 376.20 People Associated with Project: Contractor DIAZ TOP ROOFING SERVICES 2051 E CERRITOS AVE #BC ANAHEIM, CA Permit Applicant EVER DIAZ 7 SORENSON IRVINE, CA 92602 Owner AHMAD KHANJAN LLC 24881 LUNA BONITA DR Type Electrical Fixtures Qty Type Plumbing Fixtures Oly Mechanical Fixtures City The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�pHEIM OqC City of Anaheim OF io Building Division i �gNNpeo ta"^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities ar Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour con, 1 1.t.c following applicable items he. peen signed'. Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/FormsrTrenches (Footings) COA/Migation Measures Do n.: -. I subfloor or pour floor slab until the follwng applicable items have been is oned Building Final (714765.5153) Last Inspection -Final Only After Above Completed Zlt�t� / Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable hems have been sinned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFrame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable -: n signs: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within . business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service