830 S DUNE ST (4)iNEC I PLM
Permit Number: BLD2019-04636
Issued:09/18/2019
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 124
Site Address: 830 S DUNE ST
Legal Description: N TR 4057 LOT 2
eNEIM �
CITY OF ANA 4EIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
1714) 765 - 5153
_ J,
Project Description: Patio Cover: 1,100 sq ft solid cover patio built per City standard.
Patio Area: 1,100 Valuation: $3,800.00
Construcion Types: NIA, ,
Total Fees paid for Permit: 825.33
People Associated with Project:
Owner JUAN M BARAJAS 830 S DUNE ST ANAHEIM CA 92806-4828
Permit Applicant AGUSTIN BARRERA 830 S DUNE ST ANAHEIM CA
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
—sa
D�Pt+EIM O7< FINAL
INSPI:�r-d,
_ --
City of Anaheim Q i� All applicable items bea w must be signed before
Building Division f Z
v >
_ �DO&'DED �aF1
-
D ofocc to his building until the final inspections have been made.
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280gml
I
7:
Engineering Final (714) 765-5126 tNPP
'=
INSPECTION
I DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
rD
D
Do not pour concrete until the following applicable items have been signer
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List9Bus. Lic. (714) 765-5194 (AUdt21"usl_Ir essdaya)--
Setback/Formsrrrenches (Footings)
A kiI tojt4
COAIMigation Measures
-. - -stall subfloor or pour Floor slab until the follwing apit be items have been
sioned
Building Final (714 7655153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or cone c work below until the follov,.-. items have
been stoned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Flag_ Ele_ Mec. & Fire,
Insulation (Sound/Energy)
not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service