Loading...
830 S DUNE ST (4)iNEC I PLM Permit Number: BLD2019-04636 Issued:09/18/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 124 Site Address: 830 S DUNE ST Legal Description: N TR 4057 LOT 2 eNEIM � CITY OF ANA 4EIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 1714) 765 - 5153 _ J, Project Description: Patio Cover: 1,100 sq ft solid cover patio built per City standard. Patio Area: 1,100 Valuation: $3,800.00 Construcion Types: NIA, , Total Fees paid for Permit: 825.33 People Associated with Project: Owner JUAN M BARAJAS 830 S DUNE ST ANAHEIM CA 92806-4828 Permit Applicant AGUSTIN BARRERA 830 S DUNE ST ANAHEIM CA Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. —sa D�Pt+EIM O7< FINAL INSPI:�r-d, _ -- City of Anaheim Q i� All applicable items bea w must be signed before Building Division f Z v > _ �DO&'DED �aF1 - D ofocc to his building until the final inspections have been made. Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280gml I 7: Engineering Final (714) 765-5126 tNPP '= INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 rD D Do not pour concrete until the following applicable items have been signer Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List9Bus. Lic. (714) 765-5194 (AUdt21"usl_Ir essdaya)-- Setback/Formsrrrenches (Footings) A kiI tojt4 COAIMigation Measures -. - -stall subfloor or pour Floor slab until the follwing apit be items have been sioned Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or cone c work below until the follov,.-. items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Flag_ Ele_ Mec. & Fire, Insulation (Sound/Energy) not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter - Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service