Loading...
839 S BELLEVUE PL (5)Permit Types FLU I ELE I MEC I PLM �-dF�-• 4<4 Permit Nil^a,er: BLD2021-01236 Issued: 03/18/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 74 Site Address: 839 S BELLEVUE PL Legal Description: N TR 1914 LOT 59 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Addition: Reinstate permit #10363 addition 160 sq.ft bedroom, bathroom and wash room, and associated electrical #31568, and plumbing #31567 in yr. 1983. REF: INV2020-00349 Valuation: Construcion Types: Val, , Total Fees paid for Permit: 105.00 People Associated with Project: Owner MINH NGUYEN 839 S BELLEVUE PL ANAHEIM CA 92805-5003 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit _combo �NhHEIM C�< City of Anaheim OA �n0 Building Division F i u > • DED ys�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signe Fire Dept. Final (714) 765-5041 Plumbing (GroundlUnderfloor Drain Waste) 11 Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer „h') y Sub List/Bus. Lip. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Dc not Install subfloorU, pour floor slab until the Vi,ng applicable,lems have been soned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 7/�6 / q J( ii'!�_5 CJ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reirf.) t . zt L Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) De nc cover ceal the work below unH the following applicable nems have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter call be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or MEp.) Grease Interceptor , - Sewer Water Engineering Backflow (Testable Only) Water Service