839 S BELLEVUE PL (5)Permit Types
FLU I ELE I MEC I PLM
�-dF�-• 4<4
Permit Nil^a,er: BLD2021-01236
Issued: 03/18/2021
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 74
Site Address: 839 S BELLEVUE PL
Legal Description: N TR 1914 LOT 59
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Addition: Reinstate permit #10363 addition 160 sq.ft bedroom, bathroom and wash room, and
associated electrical #31568, and plumbing #31567 in yr. 1983. REF: INV2020-00349
Valuation:
Construcion Types: Val, ,
Total Fees paid for Permit: 105.00
People Associated with Project:
Owner MINH NGUYEN 839 S BELLEVUE PL ANAHEIM CA 92805-5003
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbid_permit _combo
�NhHEIM C�<
City of Anaheim OA �n0
Building Division F i
u >
• DED ys�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signe
Fire Dept. Final (714) 765-5041
Plumbing (GroundlUnderfloor Drain Waste)
11
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
„h')
y
Sub List/Bus. Lip. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Dc not Install subfloorU, pour floor slab until the Vi,ng applicable,lems have been
soned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
7/�6 / q
J(
ii'!�_5
CJ
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reirf.) t .
zt
L
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
De nc cover ceal the work below unH the following applicable nems have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter call be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or MEp.)
Grease Interceptor
, -
Sewer
Water Engineering Backflow (Testable Only)
Water Service