744 N BUSH STW
Permit Types
BLD ELE MEG FILM
X
Permit Number: BLD2024-04531
Issued: 08/29/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 92
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
f714)765. 5153
Site Address: 744 N BUSH ST, ANAHEIM, CA 92805
Legal Description: N TR 1618 BLK LOT 49
APN: 03520304
Project Description: Reroof: Remove and install (24) squares of composition
shingles over house and attached garage
Living Area: Number of Stories:
0 Valuallow 6,800.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fees paid for Permlb 359.88
People Associated with Project:
Contractor CSI CONSULTANT SOLUTIONS INC DBA GAR
33438 ANGELES FOREST HIGHWAY PALMDALE, CA
Permit Applicant Amol Garzona Lopez
Owner WILLIAMS, JERRY.B BETTY
744 N BUSH ST
Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
r�PH EtM Oq`
Cityof Anaheim o� iO
Building Division y
' 04, DIED tsy^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.6126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 766-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654691
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have beensidled
Building Final (714 7653153)
Last Inspection -Final Only After Above completed
ram/
.(
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
_
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
let Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
-
&24
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec 8 Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service