500 N ANAHEIM BLVD (3)_
Pem.: Types
BX
ELE
MEC
PLM
Permit Nunrl BLD2023-01483
issued: 03/29/2023
www.anahein.net/building
(714)765-4626
Quarter Section: 62
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANANEIM BLVD.
(7141 765 - 5153
Site Addr�iss: 500 N ANANEIM BLVD, ANANEIM, CA 92805
Legal Description: A TR ROTHAERMELS ADD BLK 4 LOT 5 ROTHAERMELS ADD L
APN: 03509610
Project Description: Repair. Remove and replace exterior wall due to vehicle damage at "Clinical de Pueblo". REF:INV2023-00020
Living Area: Number of Stories: 0 Valuation:
Garage Area. Construction Types:
Carport Area Occupancy Groups:
Balcony f Deck Area: Fire Sprinklered:
Cool Root. Total Feu paid for Pernik:
People Associated with Project
6,500.00
N/A
747,82
Permit Applicant
Jose HerreraAHaro
Owner
GALENO HEALTHCARE MANAGEMENT LLC
6005 E WASHINGTON BLVD 240
Contractor
ALPHA HOME REMODELING INC
12492 SUNGROVE STREET GARDEN GROVE, CA
Engineer - Civil
HUE C LUI
10732 LA BATISTA AVE201304181411521550 FOUNTAIN VALLEY, CA 92708
Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty,
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
��P, ��`
City of Anaheim of 10
Building Division Z
u >
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilNes are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE T1NSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
swired
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
CX
o v
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisVGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
It been soned I
st Floor Sh r
sprinkler ( lough) (Fire Delli
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
taming my after Plbg., Ele.. Mec. 8 Firen,�=t]—MWW
biiation Sound/Energy) p
not tape or taster until t following applicable items have been si ne
rywall t0
teall
Penetrations (Ele, Mec 8 Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Con, clion
r taster (Brown Coat (Jj
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service