Loading...
500 N ANAHEIM BLVD (3)_ Pem.: Types BX ELE MEC PLM Permit Nunrl BLD2023-01483 issued: 03/29/2023 www.anahein.net/building (714)765-4626 Quarter Section: 62 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANANEIM BLVD. (7141 765 - 5153 Site Addr�iss: 500 N ANANEIM BLVD, ANANEIM, CA 92805 Legal Description: A TR ROTHAERMELS ADD BLK 4 LOT 5 ROTHAERMELS ADD L APN: 03509610 Project Description: Repair. Remove and replace exterior wall due to vehicle damage at "Clinical de Pueblo". REF:INV2023-00020 Living Area: Number of Stories: 0 Valuation: Garage Area. Construction Types: Carport Area Occupancy Groups: Balcony f Deck Area: Fire Sprinklered: Cool Root. Total Feu paid for Pernik: People Associated with Project 6,500.00 N/A 747,82 Permit Applicant Jose HerreraAHaro Owner GALENO HEALTHCARE MANAGEMENT LLC 6005 E WASHINGTON BLVD 240 Contractor ALPHA HOME REMODELING INC 12492 SUNGROVE STREET GARDEN GROVE, CA Engineer - Civil HUE C LUI 10732 LA BATISTA AVE201304181411521550 FOUNTAIN VALLEY, CA 92708 Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty, The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. ��P, ��` City of Anaheim of 10 Building Division Z u > Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilNes are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE T1NSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been swired Building Final (714 765-5153) Last Inspection -Final Only After Above Completed CX o v Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have It been soned I st Floor Sh r sprinkler ( lough) (Fire Delli Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections taming my after Plbg., Ele.. Mec. 8 Firen,�=t]—MWW biiation Sound/Energy) p not tape or taster until t following applicable items have been si ne rywall t0 teall Penetrations (Ele, Mec 8 Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Con, clion r taster (Brown Coat (Jj T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service