130 W MIDWAY MNR BPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-05212
Issued: 09/3012024
www.anaheim.net/building
(714)765-4626
Quarter Section: 85
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
She Address: 130 W MIDWAY MNR B, ANAHEIM, CA 92805
Legal Description: N TR 1602 BLK LOT 6 _ - -
APN: 03707229 -
Project Description: Reroof: Remove and install (4) squares of composition shingles over Existing ADU Only See REF: BLD202d1�01724
Living Area:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof:
Number of Stones:
People Associated with Project:
Permit Applicant Samir Alquza
Owner SAMIR ALOUZA SR LIVING TRUST
Type Electrical Fixtures City Type
0 Valuation:
Construction Types:
Occupancy Groups:
Fire Spnnklered:
Total Fees paid for Pennx:
2230 PEPPER HILL DRIVE
(00C
.00
NIA
36013
Plumbing Fixtures Oty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
Pap,HEIM C�<
Cityof Anaheim OF iO
Building Division i
u >
�OVNDED tsy^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-6126
INSPECTION
I DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed-
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714765-5153)
Last Inspection -Final Only After Above Completed
it -gig
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service