Loading...
130 W MIDWAY MNR BPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-05212 Issued: 09/3012024 www.anaheim.net/building (714)765-4626 Quarter Section: 85 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 She Address: 130 W MIDWAY MNR B, ANAHEIM, CA 92805 Legal Description: N TR 1602 BLK LOT 6 _ - - APN: 03707229 - Project Description: Reroof: Remove and install (4) squares of composition shingles over Existing ADU Only See REF: BLD202d1�01724 Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Number of Stones: People Associated with Project: Permit Applicant Samir Alquza Owner SAMIR ALOUZA SR LIVING TRUST Type Electrical Fixtures City Type 0 Valuation: Construction Types: Occupancy Groups: Fire Spnnklered: Total Fees paid for Pennx: 2230 PEPPER HILL DRIVE (00C .00 NIA 36013 Plumbing Fixtures Oty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. Pap,HEIM C�< Cityof Anaheim OF iO Building Division i u > �OVNDED tsy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-6126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed- Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714765-5153) Last Inspection -Final Only After Above Completed it -gig Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service