160 N RIVERVIEW DR 300 (10)Permit Types
BLD
ELE
MEC
1 FILM
X
X
X
Permit Number: BLD2021-03327
Issued: 11/01/2021
www.anaheim.net/building
(714)7654626
Quarter Section: 219
CITY OF ANAHEIM
Site Address: 160 N RIVERVIEW DR 300, ANAHEIM, CA 92808
Lapel Description:
APN:35407113
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Tenant Improvement: Install (2) new roof mounted air conditioning units on commercial building.
LNkp Area: Number of Stories: 0 Valuation:
Garage Area: Construction Types:
Carport Area:
Balcony I Deck Area:
Cool Roof:
People Associated with Project
Occupancy Groups:
Fire Spdnklered:
Total Fees paid for permit
56,000.00
Not Applicable
2.559,50
Contractor
HILLSIDE HEATING &: AIR CONDITIONING
9304 MAGNOLIA AVEABCDEi 1139627 RIVERSIDE, CA 92503
Permit Applicant
BRIAN WHATLEY
9304 MAGNOLIA AVE RIVERSIDE, CA 9
Owner
SILVER OAKS ANAHEIM HILLS, LLC
8175 E KAISER BLVD ANAHEIM, CA 92808
ArchitecVEngineer
ADRIAN MARTINIUC
16501 SCIENTIFIC WAY STE 200201507011513112690 IRVINE, CA 92618
Architect/Engineer
NARSING V DASARI
23220 DEL LAGO DRIVE200603081545186600 LAGUNA HILLS, CA 92653
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City
Motors - over 1 h.p. to 10 h.p. 2 Air Handling Units 2
Commercial Systems per 1,000 sq 1t
Healing Appliances, incuding vent
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
N PN E I M �q,
Cityof Anaheim O P CI
Building Division
- _
�oprvpFV b,
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
t6 3p
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete u,:ii the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus, Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
soned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Undertloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
— !Es '„ rev TA,. cmdeinw - -'al,t .
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
I la
H
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
1 ,A 2S
M
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mee. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
't
29
M
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strucl., Ele., or Mee.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
STRUCTURAL OBSERVATION REPORT FORM
STRUCTURAL OBSERVATION means the visual observation of the structural system, for general conformance to the approved
plans and specifications, at significant construction stages and at completion of the structural system. Structural observation does
not include or waive the responsibility for the inspections required by Section 108, 1701 or other sections of the code.
Report No. 1
This report includes all construction work through 24th day of October 20 24 Page No. 1 of 1
Project Address:
Structural Observer of Record (SOR):
Phone No. of SOR:
160 N. Riverview Dr., Anaheim, CA 92808
Narsing Dasari
949-597-2147
Building Permit No.:
Structural Observation performed by:
Professional Lic./Reg. No. of Observer:
Phone No. of Observer:
BLD 2021-03327
Narsing Dasari
C55457
949-597-2147
OBSERVED STRUCTURAL ELEMENTS
FOUNDATION
WALL
FRAMES
FLOOR
ELEMENTS/CONNECTION
OBSERVATION LOCATION
❑ Footing, Stem Walls,
❑ Concrete
❑ Steel Moment Frame
❑ Concrete
Rooftop wood
❑ Mat Foundation
❑ Masonry
❑ Steel Braced Frame
❑ Steel Deck
platforms for the
Condensing Units
❑ Caisson, Piles, Grade
El Wood
ElFConcrete Moment
Wood
Beams
CU45 & CU46
weighing 180 & 260
❑ Retaining Foundation
❑ Others:
❑ MasonryWall Frame
❑ Others:
pounds respectively.
Hillside Special Anchors
❑ Others:
❑ Others:
NOTED DEFICIENCIES with the proposed corresponding corrective actions with respect to general conformance
with the approved plans or in the load path: (A final report by the structural observer which states that all observed
deficiencies have been resolved is required before acceptance of the work by the building officials.)
The two rooftop wood platforms supporting the Condensing Units CU45 & CU46 weighing 180 & 260 pounds
respectively were installed and are in general conformance with the intent of the approved structural drawings.
DTA takes no exceptions to the structural work performed.
This is the Final Structural Observation Report.
I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE:
1. I AM THE ENGINEER OR ARCHITECT RETAINED BY THE OWNER TO BE IN RESPONSIBLE
CHARGE FOR THE STRUCTURAL OBSERVATION INACCORDANCE WITH THE REQUIREMENTS OF
THE CITY OF ANAHEIM.
2. 1, OR ANOTHER ENGINEER OR ARCHITECTWHO I HAVE DESIGNATED ABOVE AND IS UNDER MY
RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT EACH SIGNIFICANT
CONSTRUCTION STAGE TO VERIFY IF THE STRUCTURE IS IN GENERAL CONFORMANCE WITH
APPROVED PLANS AND SPECIFICATIONS;
3. ALL NOTED DEFICIENCIES WHICH REMAIN TO BE CORRECTED HAVE BEEN INDICATED
ABOVE;
4. 1 RECOMMEND THAT ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE CITY OF ANAHEIM
BE WITHHELD UNTIL ALL OBSERVED DEFICIENCIES ARE CORRECTED.
_ 1..v..A
10-24-24
r�r \a �
ey
� _
u
* E>W. 12 31 2024
OF CA