Loading...
160 N RIVERVIEW DR 300 (10)Permit Types BLD ELE MEC 1 FILM X X X Permit Number: BLD2021-03327 Issued: 11/01/2021 www.anaheim.net/building (714)7654626 Quarter Section: 219 CITY OF ANAHEIM Site Address: 160 N RIVERVIEW DR 300, ANAHEIM, CA 92808 Lapel Description: APN:35407113 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Project Description: Tenant Improvement: Install (2) new roof mounted air conditioning units on commercial building. LNkp Area: Number of Stories: 0 Valuation: Garage Area: Construction Types: Carport Area: Balcony I Deck Area: Cool Roof: People Associated with Project Occupancy Groups: Fire Spdnklered: Total Fees paid for permit 56,000.00 Not Applicable 2.559,50 Contractor HILLSIDE HEATING &AMP: AIR CONDITIONING 9304 MAGNOLIA AVEABCDEi 1139627 RIVERSIDE, CA 92503 Permit Applicant BRIAN WHATLEY 9304 MAGNOLIA AVE RIVERSIDE, CA 9 Owner SILVER OAKS ANAHEIM HILLS, LLC 8175 E KAISER BLVD ANAHEIM, CA 92808 ArchitecVEngineer ADRIAN MARTINIUC 16501 SCIENTIFIC WAY STE 200201507011513112690 IRVINE, CA 92618 Architect/Engineer NARSING V DASARI 23220 DEL LAGO DRIVE200603081545186600 LAGUNA HILLS, CA 92653 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City Motors - over 1 h.p. to 10 h.p. 2 Air Handling Units 2 Commercial Systems per 1,000 sq 1t Healing Appliances, incuding vent The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. N PN E I M �q, Cityof Anaheim O P CI Building Division - _ �oprvpFV b, Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final t6 3p Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete u,:ii the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus, Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been soned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Undertloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections — !Es '„ rev TA,. cmdeinw - -'al,t . Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) I la H Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical 1 ,A 2S M Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall 't 29 M Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strucl., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service STRUCTURAL OBSERVATION REPORT FORM STRUCTURAL OBSERVATION means the visual observation of the structural system, for general conformance to the approved plans and specifications, at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspections required by Section 108, 1701 or other sections of the code. Report No. 1 This report includes all construction work through 24th day of October 20 24 Page No. 1 of 1 Project Address: Structural Observer of Record (SOR): Phone No. of SOR: 160 N. Riverview Dr., Anaheim, CA 92808 Narsing Dasari 949-597-2147 Building Permit No.: Structural Observation performed by: Professional Lic./Reg. No. of Observer: Phone No. of Observer: BLD 2021-03327 Narsing Dasari C55457 949-597-2147 OBSERVED STRUCTURAL ELEMENTS FOUNDATION WALL FRAMES FLOOR ELEMENTS/CONNECTION OBSERVATION LOCATION ❑ Footing, Stem Walls, ❑ Concrete ❑ Steel Moment Frame ❑ Concrete Rooftop wood ❑ Mat Foundation ❑ Masonry ❑ Steel Braced Frame ❑ Steel Deck platforms for the Condensing Units ❑ Caisson, Piles, Grade El Wood ElFConcrete Moment Wood Beams CU45 & CU46 weighing 180 & 260 ❑ Retaining Foundation ❑ Others: ❑ MasonryWall Frame ❑ Others: pounds respectively. Hillside Special Anchors ❑ Others: ❑ Others: NOTED DEFICIENCIES with the proposed corresponding corrective actions with respect to general conformance with the approved plans or in the load path: (A final report by the structural observer which states that all observed deficiencies have been resolved is required before acceptance of the work by the building officials.) The two rooftop wood platforms supporting the Condensing Units CU45 & CU46 weighing 180 & 260 pounds respectively were installed and are in general conformance with the intent of the approved structural drawings. DTA takes no exceptions to the structural work performed. This is the Final Structural Observation Report. I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE: 1. I AM THE ENGINEER OR ARCHITECT RETAINED BY THE OWNER TO BE IN RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSERVATION INACCORDANCE WITH THE REQUIREMENTS OF THE CITY OF ANAHEIM. 2. 1, OR ANOTHER ENGINEER OR ARCHITECTWHO I HAVE DESIGNATED ABOVE AND IS UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IF THE STRUCTURE IS IN GENERAL CONFORMANCE WITH APPROVED PLANS AND SPECIFICATIONS; 3. ALL NOTED DEFICIENCIES WHICH REMAIN TO BE CORRECTED HAVE BEEN INDICATED ABOVE; 4. 1 RECOMMEND THAT ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE CITY OF ANAHEIM BE WITHHELD UNTIL ALL OBSERVED DEFICIENCIES ARE CORRECTED. _ 1..v..A 10-24-24 r�r \a � ey � _ u * E>W. 12 31 2024 OF CA SIGNATURE OF STRUCTURAL OBSERVER DATE STAMP OF STRUCTURAL OBSERVER