520 S SONYA ST (2)Permit hypes
BLD
I ELE
I MEC
PLM
X
X
Permit Number: BLD2021-01494
Issued: 04/05/2021
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 54
Site Address: 520 S SONYA ST
Legal Description: N TR 9300 LOT 109
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Patio Cover: 312 sf. to construct attached alumawood patio cover with electrical.
Valuation:
Construcion Types:
Total Fees paid for Permit:
$800.00
N/A, ,
397.53
People Associated with Project:
Owner MICHAEL J WONG 520 S SONYA ST ANAHEIM CA 92802-1339
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Receptacle, switches, lights
9
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
HpHEIM cq
Cityof Anaheim
Building Division
�\ - •�
0 CEO �sy^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
/;
(_A
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subtloor or pour floor slab until the follwing applicable items have been
sialred
Building Final (714765.5153)
last Inspection -Final Only After Above Completed
7�r J/�)
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
yZS-2-1 t-"&F4— bit /4
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist(Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., EIe., Mec. 8 Fire)
Insulation (Sound/Energy)
D, not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
'D,, in! backfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service
.a I