520 S SONYA ST (2)Permit hypes BLD I ELE I MEC PLM X X Permit Number: BLD2021-01494 Issued: 04/05/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 54 Site Address: 520 S SONYA ST Legal Description: N TR 9300 LOT 109 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Patio Cover: 312 sf. to construct attached alumawood patio cover with electrical. Valuation: Construcion Types: Total Fees paid for Permit: $800.00 N/A, , 397.53 People Associated with Project: Owner MICHAEL J WONG 520 S SONYA ST ANAHEIM CA 92802-1339 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 9 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. HpHEIM cq Cityof Anaheim Building Division �\ - •� 0 CEO �sy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final /; (_A Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subtloor or pour floor slab until the follwing applicable items have been sialred Building Final (714765.5153) last Inspection -Final Only After Above Completed 7�r J/�) Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections yZS-2-1 t-"&F4— bit /4 Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist(Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., EIe., Mec. 8 Fire) Insulation (Sound/Energy) D, not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor 'D,, in! backfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service .a I