Loading...
400 W DISNEY WAY 096Permit Types BLD ELE MEC PLM X X X X t0 Permit Number: BLD2019-00927 Issued: 02/28/2020 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 87 Site Address: 400 W DISNEY WAY 159 Legal Description: CITY OF ANAHEIM RU'LDING DIV!°ICN 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Change of Use: 1,606 sq ft first-time build out for new "Chatoie Dessert Cafe". Valuation: Constmcion Types: occupancy Groups: Fire Sprinklered? Total Fees paid for Permit: People Associated with Project: $120,000.00 A: , B,,.. Yes 9.742.76 Engineer ZHENYU M SONG 12631 IMPERIAL HWY STE F-230 SANTA FE CA Engineer ZHIQIANG ZHANG 410 S SAN GABRIEL BLVD STE 8 SAN GABRIEL CA 91776 Contractor ZEN CONSTRUCTION INC 285 W ARROW HWY UPLAND CA 91786 Permit Applicant CHEUNG KAN 285 W ARROW HWY UPLAND CA 91786 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Meter/Disc Sw - under 600 V, up to 200 1 Lavatory 1 Evaporative or Air Cooled Condenser 1 amps Water Closet 1 Ventilation Fan - <= 300 din on single duct 2 Receptacle, switches, lights 21 Urinal 1 Commercial Hoods (including ducts) 1 Kitchen Sink 1 Commercial Systems per 1,000 scl ft 2 Repair/Drainage Alteradon/Vent Piping 1 Floor Drain 2 Floor Sink 4 Service, Mop, Slop Sink 1 Dishwasher 1 Water Heater 1 Bar Sink 1 Water Distribution 1 Gas System (1-5 outlets) 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. ftid_permit_combo �p.H Elm Cq Cityof Anaheim D� P `'O Building Division F y D > �OVNpeD 1bh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 766-4280 cc�1 nn \i0 1 s\rtJ Engineering Final (714) 765-5126 INSPECTION INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 1 bus & Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subtloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections n Lzg/ Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Z � N C' K -e • WIt fG F �— Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) 'Po UP Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele.. Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections wT—TvL Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) c T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service