100 W DISNEY WAY (4)A
�v
Permit Number: BLD2019-05121
Issued:01/28/2020
INSPECTION REOUEST LINE:
(714) 765 - 4626
Quarter Section. 87
Site Address: 100 W DISNEY WAY
Legal Description:
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5163
Project Description: Tenant Improvement: Installation access gates one for entry and one exit surrounding hotel guest with
associated electrical, restriping and eliminating parking stalls for equipment gates.
Valuation:
$200, 000.00
Construcion Types:
N/A, ,
Fire Spdnklered?
No
cool Roof
No
Total Fees paid for Permit:
1,972.50
People Associated with Project:
Permit Applicant MICHAEL ALPUCHE
Contractor W P S PARKING SYSTEMS - U S A CORP 335 MIRA LOMA AVE GLENDALE CA 91204
Type Electrical Fixtures City Type Plumbing Fixtures Oty, Type Mechanical Fixtures City
Motors - Factory Wired Appliance, up to 1 4
h.p.
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
j PNDt4il Cq<
..1ty of Anaheim DF IO
Building Division ' i
�Db
A'DEO tali^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
f
All applicable items below must be signed before utilities are ie.,
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
PP
Cross Connection Control (714) 765.41`IJ_
Engineering Final (714) 765-5126
INSPECTION
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.50BT ^. --
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041 ----
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAfMigation Measures
Do not ins!all sub0oor or pour floor slah until the follwing applicable items have been
,r -
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or con'__=al the work below until the following applicable items have
been in•
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Plhp Ei, 'Nec & Fire
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec 8 Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-i Meter will be set within 2-3
business day_ after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service