725 E ECHO STPermit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2021-04698
Issued: 02/28/2022
www.anaheim.net/building
(714)765.4626
Quarter Section: 48
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 • 5153
Site Address: 725 S ECHO ST, ANAHEIM, CA 92804
Legal Description: N TR 2425 LOT 168
APN: 12823113
Project Description: Residential Remodel: Remove and fill (2) window openings in kitchen and dining room, replace (1) window in
bathroom and sliding glass door, replace electrical, mechanical, and plumbing fixtures, remove walls in detach garage to return to
original state all for unpermitted work. REF: INV2021-00218
Living Area: Number of Stories:
1 Valuation: 30,000.00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Spdnklered:
Cool Roof:
Total Fees paid for Permit: 1,354.90
People Associated with Project:
Permit Applicant Irma Lorah
Owner LORAH, LARRY 8 IRMA
725 S ECHO ST ANAHEIM, CA 92804
Engineer - Civil Manuel A Espino
12109 Woodruff Ave Downey, CA 90241
Architect Manuel Cortez
21287 Shakespeare Ct Moreno Valley, CA 92557
Type Electrical Fixtures Cry Type
Plumbing Fixtures (:fly Mechanical Fixtures Qty
Receptacle, switches, lights 21 Dishwasher
1 Ventilation Fan - <- 300 cfm on single duct 2
Garbage Disposal
1
Kitchen Sink
1
Lavatory
1
Shower
1
Water Closet
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
NN PH EIM c-qC
Cityof Anaheim 4 I
D a,
Building Division f z
•�
OVNDED t%
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
— -
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7651428C lJ
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 5 . �.
Do not pour concur..= entil the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Formsfrrenches (Footings)
COArMigation Measures
Do not install subfloor or pour floor slab until the tollwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless s oned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service