Loading...
105 S VISTA GRANDE (3)Permit Types BLD 1 ELE MEC PLM X Permit Number: BLD2023-05384 Issued: 08/21/2024 www.anaheim. neVbuildi ng (714)7654626 Quarter Section: 179 Site Address: 105 S VISTA GRANDEAnaheim, CA 92807 Legal Description: N TR 14641 BLK LOT 9 APN: 36322121 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Retaining Wall: Structural strengthening and tieback to portions of existing retaining wall Living Area: Number of Stones: 0 Valuation: 48,000.00 Garage Area: Construction Types: VB Carport Area: occupancy Groups: Balcony / Deck Area: Fire Sprinklered: No Cool Roof: Total Fees paid for Permit: 1,145.24 People Associated with Project: Contractor DALINGHAUS CONSTRUCTION INC 445 BIRCH LAKE LAKE ELSINORE, CA 92530 Permit Applicant Jamie Garcia Owner VIELE, MICHAEL F 105 S VISTA GRANDE Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Futures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. *Nf,HEIM �.d< City of Anaheim OA iO Building Division F z > NDED ta`'^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7665041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer I I Sub Llst/Bua. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) I jo i COA/Migation Measures Do not install sub0oor or pour Floor slab until the follwing applicable items have been Building Final (714 7655153) Last Inspection -Final Only Aker Above Completed II(/ IFvjb1 t Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Pli Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfil unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service Engineering Services & Design of SoCal Inc. 10/31/2024 19827 Reedview Drive, Rowland Heights, CA 91748 Phone (714) 726-1018 Dalinghaus Construction Jamie Garcia 445 Birch Street, Lake Elsinore, CA 92530 Subject: Final Geotechnical Report for Helical Tieback Installation At Existing (E) Retaining Wall 5400 E Suncrest Road, Anaheim, CA 92807 Project No: 23-119-GD1 To Whom it May Concern: The purpose of this letter is to discuss the installation of Helical Tiebacks at the property located at 5400 E Suncrest Road, Anaheim, CA 92807. A total of 12 Helical Tiebacks were installed as approved plans. Geotechnical and Structural observations were performed as required by approved plans. All Helical Tiebacks were observed as they were driven into the soil. The Helical Tiebacks were embedded into very dense clayey sand (SC). The depth of installed Helical Tiebacks was approximately 20 feet in length. The applied pressure on the Tiebacks ranges from 3,780 Ibs-feet, corroborating the loading conditions presented in the geotechnical and structural calculations report. Additionally, a pullout test was performed as required by approved plans. The pullout test met the creep testing requirement and was approved. The helical tieback was tested utilizing the pullout method as stated in ASTM D3689 section 6; the maximum test load was held for a minimum of 10 minutes and passed the elongation criteria with no discernible movement during the tension test. This letter concludes the subject site repair as per the permitted plans. Thanks for choosing Dalinghaus Construction and Engineering Services & Design of SoCal Inc. for your foundation problems. If you have any further questions, please feel free to contact my office at any time. Sincerely, Pablo Naranjo, PE, GE Principal Engineer Engineering Services & Design of SoCal Inc. 19827 Reedview Drive, Rowland Heights, California 91748 pnaranjo@edsocal.com www.edsocal.com GEOTECHNICAL • STRUCTURAL • FOUNDATION • ARCHITECTURE 19827 Reedview Dr. Rowland Heights, CA 917481 (714) 716-2189 1 www.edsoeW.com <J�u C694s o_� Page 1 of 3 HELICAL TIEBACK INSTALLATION LOG Job Name: Anaperalta Address: 105 S Vista Grande, Anaheim, CA Contractor: Dolinghaus Construction Inc. Pier Section Length: 3.5 feet Dates: 10/17/24, 10/21/24, 10/22/24 Job Number: 23-119-GDS Motor Torque Conversions: X Pengo RS-6X = 2.7 Pro Dig L6K5= 2.53 12K Eskridge= 6.85 sgin GEOTECHNICAL • STRUCTURAL • FOUNDATION • ARCHITECTURE 19627 Reedv.bw Of. Rowland Heights. CA 917481 Q141718-2189 1 www.edsocaLcom I fit In F �Gici_i k �a LW Page 2 of 3 PUSH PIER INSTALLATION LOG Job Name: Anaperalta Address: 105 S Vista Grande, Anaheim, CA Contractor: Dolinghaus Construction Inc. Pier Section Length: 3.5 feet Dates: 10/17/24, 10/21/24, 10/22/24 Job Number: 23-119-GD1 Motor Torque Conversions: X Pengo RS-6X = 2.7 Pro Dig L6K5= 2.53 12K Eskridge= 6.85 sgin eee ee err ee eee ee eee ee eee ee __ ____ GEOTECHNICAL • STRUCTURAL • FOUNDATION • ARCHITECTURE 19827 Reedv'.ew Dr. Rowland heights. CA 917481 (714) 718.2189 1 www.edsocal.com nr n" In LW Page 3 of 3