262 N CAMINO ARROYO (3)Permit Types
BLD
1 LE
MEC
PLM
x
x
x
I x
Permit Number: BLD2022-04780
Issued: 09/0112023
www.anaheim.net/building
(714)765-4626
Quarter Section: 190
CITY OF ANAHEIM
Site Address: 262 N CAMINO ARROYOANAHEIM, CA 92807
Legal Description: N TR 8080 BLK LOT 69
APN: 35814304
BUILDING DIVISION
200 S. ANAHEIM BLVD.
p1141765 -5153
4
Project Description: Residential Remodel: 200 sq. ft. to relocate master and existing bathroom doorways, convert den to new walk-in
closet and bathroom. Upgrade electrical, mechanical and plumbing in kitchen, bathrooms and hallway. Create (2) new window openings
and replace nail -on window and sliding door. REF:INV2022-00308
Living Area: Number of Stories: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area. Fire Spnnklered:
Cool Roof: Total Fee. paid for Permit:
People Associated with Project
200,000.00
VB
2,539.98
Permit Applicant Yatish Nathrej 262 n Camino arroyo Anaheim, CA 92807
Owner NATHRAJ YATISH M 262 N CAMINO ARROYO
Engineer - Civil JAMES G FOX 851 PANORAMA RD201301101246477300 FULLERTON, CA 92831
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Receptacle, switches, lights 20 Floor Drain 3 Ventilation Fan - <= 300 cfm on single duct 3
Lavatory 2
Sewer per 100 ft. 1
Shower 2
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
��f,NEIM �7<
Cityof Anaheim D4 iO
Building Division
u '
�DVNDED 1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
I
'�
Plumbing Final
r
Mechanical Final
�V
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
'7 7.4
d
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
7�I S-/U4 I-pp�/rlar 5bwr 61 9*1
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned.
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
(ry
l7 7i{
Rough Electrical
U% IH
2,
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
7
2
T�0
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
% iS
7
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service