Loading...
262 N CAMINO ARROYO (3)Permit Types BLD 1 LE MEC PLM x x x I x Permit Number: BLD2022-04780 Issued: 09/0112023 www.anaheim.net/building (714)765-4626 Quarter Section: 190 CITY OF ANAHEIM Site Address: 262 N CAMINO ARROYOANAHEIM, CA 92807 Legal Description: N TR 8080 BLK LOT 69 APN: 35814304 BUILDING DIVISION 200 S. ANAHEIM BLVD. p1141765 -5153 4 Project Description: Residential Remodel: 200 sq. ft. to relocate master and existing bathroom doorways, convert den to new walk-in closet and bathroom. Upgrade electrical, mechanical and plumbing in kitchen, bathrooms and hallway. Create (2) new window openings and replace nail -on window and sliding door. REF:INV2022-00308 Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area. Fire Spnnklered: Cool Roof: Total Fee. paid for Permit: People Associated with Project 200,000.00 VB 2,539.98 Permit Applicant Yatish Nathrej 262 n Camino arroyo Anaheim, CA 92807 Owner NATHRAJ YATISH M 262 N CAMINO ARROYO Engineer - Civil JAMES G FOX 851 PANORAMA RD201301101246477300 FULLERTON, CA 92831 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty Receptacle, switches, lights 20 Floor Drain 3 Ventilation Fan - <= 300 cfm on single duct 3 Lavatory 2 Sewer per 100 ft. 1 Shower 2 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. ��f,NEIM �7< Cityof Anaheim D4 iO Building Division u ' �DVNDED 1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final I '� Plumbing Final r Mechanical Final �V Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) '7 7.4 d Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections 7�I S-/U4 I-pp�/rlar 5bwr 61 9*1 Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical (ry l7 7i{ Rough Electrical U% IH 2, Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) 7 2 T�0 Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath % iS 7 Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service