724 S LANGTREE LN (6)Permit Types
BI.D ELE MEC PLM
X
Permit Number: BLD2024-05695
Issued: 10/25/2024
www.anaheim.net/building
(714)7654626
Quarter Section: 193
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 724 S LANGTREE LN, ANAHEIM, CA 92807
Legal Description: N TR 10970 BLK LOT 32
APN: 36351132
Project Description: Residential EV Charger Level 2
Living Area: Number of Stories:
Valuation: 0.00
Garage Area:
Construction Types:
Carport Area:
Occupancy Gmups:
Balcony I Deck Area:
Fire Spdnklered:
Cool Roof:
Total Fees paid for permit: 1T7.00
People Associated with Project:
Contractor TROUT ELECTRIC
2020 IOWA AVE,SUITE 102 RIVERSIDE, CA 92504
Permit Applicant TROUT ELECTRIC
17843 GLEN HOLLOW WAY RIVERSIDE, CA 92504 0000
Type Electrical Fixtures Oty Type
Plumbing Fixtures Cry Mechanical Fixtures Cty
EV Charger 1
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
�NnHEIM Cq<
City of Anaheim O� iO
Building Division i
>
OGMDED �By�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPE&OR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
l
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7653280
Engineering Final (714) 765.5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (GroundlUnderfloor Drain Waste)
Water Engineering (714) 766-4691
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install sub0oor or pour Floor slab until the follwing applicable items have been
sianed
Building Final (714 765-5163)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service