Loading...
815 E SYCAMORE ST (6)Permit Types BLD ELE I MEC PLM X Permit Number: BLD2023.03312 Issued: 10/03/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 82 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 766 -5153 Site Address: 815 E SYCAMORE ST, Anaheim, CA 92806 Legal Description: A TR VINEYARD LOTS BLK LOT B1 VINEYARD LOTS LOT B- APN: 03521003 Project Description: Antenna Cell Site: Modification to existing cell site for "Verizon". Living Area: Number of Stories: 0 Valuation: 20,000.00 Garage Area: Construction Types: N/A Carport Area: Ocwpancy Groups: Balcony / Deck Area: Fire Spdnklered: No Cool Roof: Total Fees paid for permit: 761.60 People Associated with Project: Contractor AMATEL INC 1017 S MOUNTAIN AVE200912141014133010 MONROVIA, CA 91016 Permit Applicant Alejandro Rios Owner ANAHEIM POST #3173 VETERANS OF FOREIG 805 E SYCAMORE ST Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PHEIM oq` Cityof Anaheim ok iO Building Division F i v > �OGNDED tit`'^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer - Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install sub600r or pour floor slab until the follwing applicable items have been sioned Building Final (714765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Leo not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service