815 E SYCAMORE ST (6)Permit Types
BLD ELE I MEC PLM
X
Permit Number: BLD2023.03312
Issued: 10/03/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 82
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 766 -5153
Site Address: 815 E SYCAMORE ST, Anaheim, CA 92806
Legal Description: A TR VINEYARD LOTS BLK LOT B1 VINEYARD LOTS LOT B-
APN: 03521003
Project Description: Antenna Cell Site: Modification to existing cell site for "Verizon".
Living Area: Number of Stories:
0 Valuation:
20,000.00
Garage Area:
Construction Types:
N/A
Carport Area:
Ocwpancy Groups:
Balcony / Deck Area:
Fire Spdnklered:
No
Cool Roof:
Total Fees paid for permit:
761.60
People Associated with Project:
Contractor AMATEL INC 1017 S MOUNTAIN AVE200912141014133010 MONROVIA, CA 91016
Permit Applicant Alejandro Rios
Owner ANAHEIM POST #3173 VETERANS OF FOREIG 805 E SYCAMORE ST
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�PHEIM oq`
Cityof Anaheim ok iO
Building Division F i
v >
�OGNDED tit`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
-
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install sub600r or pour floor slab until the follwing applicable items have been
sioned
Building Final (714765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Leo not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service