721 N TOPEKA ST (2)Pennit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD202"3197
Issued: 08/25/2021
www.anaheim.net/building
(714)765-4626
Quarter Section: 82
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 •5153
Site Address: 721 N TOPEKA ST
Legal Description: N TR 247 BLK B LOT 27
APN: 03515320
Project Description: Residential Remodel: Change out (5) retrofit windows. Replace plumbing, electrical, and mechanical fixtures in
kitchen and bathroom; and relocate water heater and gas line. Removal non load bearing walls in kitchen to create open floor plan.
Living Area: Number of Stories: 0 Valuation: /5,000.00
Garage Area: Construction Types: VB
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spnnklered: No
Cool Roof: Total Fws paid for Prank: 1.530.96
People Associated with Project
Owner ELEAZER FRANCO AND PERRY TSUI 721 N TOPEKA ST ANAHEIM, CA
Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty
Receptacle, switches, lights 31 Garbage Disposal Gas System (1-5 outlets) 1
Kitchen Sink 1 Ventilation Fan - <= 300 don on single duct 2
Lavatory
Repair/Drainage AlterationNent Piping
Shower
Water Distribution
Water Heater
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of Parrett Issuance. A now permit Is required to commence or continue work.
NPNEIM �.q
Cityof Anaheim of/� o
Building Division Z
opH
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub Lisf/Bus. Lie. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the tollwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
y�112L
A�
MMI i�,t�,
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mee. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mee & Flog)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mae.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service