Loading...
721 N TOPEKA ST (2)Pennit Types BLD ELE MEC PLM X X X X Permit Number: BLD202"3197 Issued: 08/25/2021 www.anaheim.net/building (714)765-4626 Quarter Section: 82 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 •5153 Site Address: 721 N TOPEKA ST Legal Description: N TR 247 BLK B LOT 27 APN: 03515320 Project Description: Residential Remodel: Change out (5) retrofit windows. Replace plumbing, electrical, and mechanical fixtures in kitchen and bathroom; and relocate water heater and gas line. Removal non load bearing walls in kitchen to create open floor plan. Living Area: Number of Stories: 0 Valuation: /5,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: No Cool Roof: Total Fws paid for Prank: 1.530.96 People Associated with Project Owner ELEAZER FRANCO AND PERRY TSUI 721 N TOPEKA ST ANAHEIM, CA Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty Receptacle, switches, lights 31 Garbage Disposal Gas System (1-5 outlets) 1 Kitchen Sink 1 Ventilation Fan - <= 300 don on single duct 2 Lavatory Repair/Drainage AlterationNent Piping Shower Water Distribution Water Heater The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of Parrett Issuance. A now permit Is required to commence or continue work. NPNEIM �.q Cityof Anaheim of/� o Building Division Z opH Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub Lisf/Bus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the tollwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed y�112L A� MMI i�,t�, Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mee & Flog) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mae.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service