Loading...
806 S DANBROOK DR (3)• Permit Types BLD ELE I MEC PLM X X Permit Number: BLD2024-03980 Issued: 08/02/2024 oniw'4- CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 - 5163 pv 44' www.anaheim.net/building a im '✓A (714)765-4626 Quarter Section: 6 Site Address: 806 S DANBROOK DR, Anaheim, CA 92804 Legal Description: N TR 2839 BLK LOT 163 APN: 07942502 Project Description: Residential Photovoltaic System - Inverters (without ESS) Living Area: Number of Stories: Valuation: 13,033.90 Garage Area: Construction Types: CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: 172.00 People Associated with Project: Contractor BETTER EARTH ELECTRIC INC 16720 MARQUARDT AVENUE SUITE 908/909 CERRITOS, CA 92705 Permit Applicant Mark Hellsund 16720 Marquardt Ave Cerritos, CA 90703 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Inverter i The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. r rPHEIM cq `City of Anaheim 04 r <'O Building Division y u ' �OVNDEO vain Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765.6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned- Building Final (714 765-5153) Last Inspection -Final Only After Above Completed I71' Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.18ond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless a oned off) Sewer Water Engineering Backflow, (Testable Only) Water Service