806 S DANBROOK DR (3)• Permit Types
BLD
ELE
I MEC
PLM
X
X
Permit Number: BLD2024-03980
Issued: 08/02/2024
oniw'4-
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765 - 5163
pv
44'
www.anaheim.net/building
a im '✓A
(714)765-4626
Quarter Section: 6
Site Address: 806 S DANBROOK DR, Anaheim, CA 92804
Legal Description: N TR 2839 BLK LOT 163
APN: 07942502
Project Description: Residential Photovoltaic System - Inverters (without ESS)
Living Area: Number of Stories:
Valuation: 13,033.90
Garage Area:
Construction Types:
CarportArea:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fees paid for Permit: 172.00
People Associated with Project:
Contractor BETTER EARTH ELECTRIC INC
16720 MARQUARDT AVENUE SUITE 908/909 CERRITOS, CA 92705
Permit Applicant Mark Hellsund
16720 Marquardt Ave Cerritos, CA 90703
Type Electrical Fixtures Qty Type
Plumbing Fixtures Qty Mechanical Fixtures Qty
Inverter i
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
r rPHEIM cq
`City of Anaheim 04 r <'O
Building Division y
u '
�OVNDEO vain
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.6126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned-
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
I71'
Plumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.18ond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless a oned off)
Sewer
Water Engineering Backflow, (Testable Only)
Water Service