Loading...
703 N MAVIS ST 1-4Permit Types BLD ELE T MEC PLM X Permit Number: BLD2024-05270 Issued: 10/03/2024 www.anatheinn.net/building (714)765-4626 Quarter Section: 82 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 4714) 765 - 5153 Site Address: 703 N MAVIS ST 1-4, ANAHEIM, CA 92805 Legal Description: N TR 3051 BLK LOT 1 TR 3051 LOT 1 AND LOTS 2 TO 11 APN: 03520412 Project Description: Reroof: Remove and install (21) sq of composiflon shingles over the entire complex Living Area: Number of Stories: t Valuabon: Garage Area: Construction Types: Camon Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered. Cool Roof: Total Fees paid for Permit: r.H EIA , ,vl 4k People Associated with Project: Contractor ABSOLUT ROOFING INC P O BOX 5262200005021155333920 HUNTINGTON BEACH, CA 92708 Permit Applicant Sarah Hammarstrom Owner STRATTFORD MAVIS LLC 18831 VON KARMAN AVE 350 Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures 16,500.00 NIA 363.62 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ^HEIM Cityof Anaheim O� PN dd�o\ Building Division 'i OVNOEO sh Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days) Setback/Forms/Trenches (Footings) 1COAJMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stared 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFrame) 7,57 Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backf 11 unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service