759 N MAVIS ST 1-4Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-05271
Issued: 10/03/2024
vviviv.anaheim.net/building
(714)765-4626
Quarter Section: 82
CITY OF ANAHEIM
BUILDING DIVISION
200 $. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 759 N MAVIS ST 1-4, ANAHEIM, CA 92805
Legal Description: N TR 3051 ELK LOT 1 TR 3051 LOT 1 AND LOTS 2 TO 11
APN: 03520412
Project Description: Reroof: Remove and install (21) sq of composition shingles over the entire complex
Living Area: Number of Stones: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spnnklered:
Cool Roof: Total Fees paid for Permit:
4,
People Associated with Project:
Contractor ABSOLUT ROOFING INC P O BOX 5262200005021155333920 HUNTINGTON BEACH, CA 92708
Permit Applicant Sarah Hammarstmm
Owner STRATTFORD MAVIS LLC 1BB31 VON KARMAN AVE 350
16,500,00
N/A
363.62
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures City
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PtiEl/H �.�`
Cityof Anaheim 4 �o
Building Division i
>
�DDNDED �8�^
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765<591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
i n d:
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
ti
\�
\\
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele., Mee. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed-
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mac.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service