Loading...
759 N MAVIS ST 1-4Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-05271 Issued: 10/03/2024 vviviv.anaheim.net/building (714)765-4626 Quarter Section: 82 CITY OF ANAHEIM BUILDING DIVISION 200 $. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 759 N MAVIS ST 1-4, ANAHEIM, CA 92805 Legal Description: N TR 3051 ELK LOT 1 TR 3051 LOT 1 AND LOTS 2 TO 11 APN: 03520412 Project Description: Reroof: Remove and install (21) sq of composition shingles over the entire complex Living Area: Number of Stones: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: 4, People Associated with Project: Contractor ABSOLUT ROOFING INC P O BOX 5262200005021155333920 HUNTINGTON BEACH, CA 92708 Permit Applicant Sarah Hammarstmm Owner STRATTFORD MAVIS LLC 1BB31 VON KARMAN AVE 350 16,500,00 N/A 363.62 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures City The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PtiEl/H �.�` Cityof Anaheim 4 �o Building Division i > �DDNDED �8�^ Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765<591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been i n d: Building Final (714 765.5153) Last Inspection -Final Only After Above Completed ti \� \\ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele., Mee. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed- Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2- business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mac.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service