Loading...
303 S BRODER ST (7)PermR Types BLD ELE MEC PLM X Permit Humber: BLD2024-05203 Issued: 10/02/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 13 Site Address: 303 S BRODER ST, Anaheim, CA 92804 Legal Description: N TR 2655 BLK LOT 64 APN: 12610225 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Residential Remodel: Changeout (3) retrofit windows Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: O=paacy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: ��PH t_In 'q,, 3,000.00 NIA 177.00 People Associated with Project: Contractor HOME DEPOT U S A INC DBA THE HOME DEPO P 0 BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA, GA 9280 Owner MEADOWS, VERA M 303 S BRODER ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ill P�f,NEIM pq` ,,dity of Anaheim OI iO Building Division F z u > OVNDEO v8h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS 944Al`E ;INSPECTOR All applicable items below must be signed before utilities aretreleased Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been stoned Building Final (714765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_. Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items h2. _ ': een signed: Drywall Drywall Penetrations (Ele, Mec 8: Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor (Do not backf 11 unless stoned off) Sewer Water Engineering Backflow, (Testable Only) Water Service