816 S SYLVAN ST (5)Permit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2024-05232
Issued: 10/30/2024
www.anaheim. net/building
(714)765-4626
Quarter Section: 21
Site Address: 816 S SYLVAN ST, ANAHEIM, CA 92804
Legal Description: N TR 1951 BLK LOT 78
APN: 12620404
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 •5153
Project Description: Photovoltaic System: Install roof mounted solar system with (10) modules and (1) Inverter
�pNl i^
P
R
Ar
Living Area:
Number of Stories:
1 Valuation: 12,00000
Garage Area.
Construction Types: VB
Cartoon Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Root
Total Fees paid for Permit: 424.56
People Associated with Project:
Contractor
CLEAN ENERGY SOLUTIONS INC
417 W ALLEN AVE STE 105 SAN DIMAS, CA 91773
Permit Applicant
Francisco Ruiz
Owner
GAXIOLA, RAUL F & JEANETTE G.
816 SYLVAN ST
Type
Electrical Fixtures City Type
Plumbing Fixtures City Mechanical Fixtures OI
Inverter
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
^City of Anaheim PN."Mm -1.
OF iO
Building Division i
u >
FoCONDED vs�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765.6194 (Allow 10 business days)
SetbacklFormslTrenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the folWng applicable items have been
sianed
Building Final (714765-5153)
Last Inspection -Final Only After Abovv Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the followng applicable items have
been sloped
let Floor Shear
Firesprinkler(Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragmlFrame)
Masonry (Reinf.IBond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mee & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable nems have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service