405 S ANAHEIM BLVDPermit Types
BLD ELE MEC PLM
X
Permit Number: BL02023-05587
Issued: 11/30/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 84
Site Address: 405 S ANAHEIM BLVD, Anaheim, CA 92805
Legal Description: N TR 17351 BLK LOT 3
APN: 03702216
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: 820 sq ft to redesign existing rooftop desk and install new PVC roof
Living Area: Number of Stories: 4 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spnnklered:
Cool Roof: Total Fees pald for Parrott:
People Associated with Project:
Contractor RIDGELINE CONSTRUCTION GROUP 26242 DIMENSION DRIVE,SUITE 240 LAKE FOREST, CA
Pennit Applicant Kevin Craib
Owner DOMAIN OWNERS ASSOCIATION 3090 BRISTOL ST 200
46,000,00
Is
Yes
1,566.88
Type Electrical Fixtures City Type Plumbing Fixtures Orly Mechanical Fixtures Oly
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PapHEfM C�<
City of Anaheim O� iO
Building Division z
v i
�ot,NpEp ta`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4260
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfioor or pour floor slab until the follwing applicable items have been
-
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
i(I} ��
�r .I. A.A -
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
iz
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signetl.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Win not hackfill unless gionPA off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service