Loading...
703 N MAVIS ST 1-4 (2)Permit Types BLD ELE MEC PE X Permit Number: BLD2024-05153 Issued: 09126/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 82 Site Address: 703 N MAVIS ST 14, Anaheim, CA 92805 Legal Description: TR 3051 LOT 1 AND LOTS 2 TO 11 INC APN: 03520412 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 17141765 - 5153 /PNP EIM C Project Description: Residential Remodel: Remove and replace 10 windows for apartment complex. REF: BLD2010-00733 Living Area: Number of Stones: Garage Area: Carport Area: Balcony I Deck Area. Cool Roof: People Associated with Project: Permit Applicant lonut Rus Owner STRATTFORD MAVIS LLC 1 Valuation: Construction Types: Occupancy Groups: Fire Spnnklered, Total Fees paid for Permit: 18831 VON KARMAN AVE 350 Type Electrical Fixtures Qty Type Plumbing Fixtures City V Ke Mechanical Fixtures 2,400.00 VB No 111.00 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PNbHelht ��< Cityof Anaheim OF iO Building Division F 2 > �OVNDED t8h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed- Building Final (714 765-5153) Last Inspection -Final Only After Above Completed q�J 'J Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service