703 N MAVIS ST 1-4 (2)Permit Types
BLD ELE MEC PE
X
Permit Number: BLD2024-05153
Issued: 09126/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 82
Site Address: 703 N MAVIS ST 14, Anaheim, CA 92805
Legal Description: TR 3051 LOT 1 AND LOTS 2 TO 11 INC
APN: 03520412
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
17141765 - 5153
/PNP EIM C
Project Description: Residential Remodel: Remove and replace 10 windows for apartment complex. REF: BLD2010-00733
Living Area: Number of Stones:
Garage Area:
Carport Area:
Balcony I Deck Area.
Cool Roof:
People Associated with Project:
Permit Applicant lonut Rus
Owner STRATTFORD MAVIS LLC
1 Valuation:
Construction Types:
Occupancy Groups:
Fire Spnnklered,
Total Fees paid for Permit:
18831 VON KARMAN AVE 350
Type Electrical Fixtures Qty Type Plumbing Fixtures City
V
Ke
Mechanical Fixtures
2,400.00
VB
No
111.00
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
PNbHelht ��<
Cityof Anaheim OF iO
Building Division F 2
>
�OVNDED t8h^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed-
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
q�J
'J
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service