Loading...
272 S JUTEWOOD ST (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-01924 Issued: 04/16/2024 www.anaheim. net/build i ng (714)765-4626 Quarter Section: 219 Site Address: 272 S JUTEWOOD ST, ANAHEIM, CA 92808 Legal Description: N TR 10984 BLK LOT 61 APN: 35404422 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Residential Remodel: To change out (2) Retro-fit sliding doors Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Number of Stories: 1 Valuation: 6,011.00 Construction Types: NIA Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: 172,00 People Associated with Project: Contractor BROTHERS HOME IMPROVEMENT INC 233 TECHNOLOGY WAY #A5201808210936501172 ROCKLIN, CA 90670 Permit Applicant Michael Foreman Owner LINDHOLM, ELVIA TR 336 LIVINGSTON AVE Type Electrical Fixtures City Type Plumbing Fixtures Cry Mechanical Fixtures City The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PHpHE1M C7< City of Anaheim of iO Building Division F i > �oUA,p EO toy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed 11 / Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service