922 S SEDONA LNPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-02327
Issued: 05/08/2024
www.anaheim. net/bu i Iding
(714)7654626
Quarter Section: 226
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
Site Address: 992 S SEDONA LN, ANAHEIM, CA 92808
Legal Description: N TR 14077 ELK LOT 20
APN: 51402116
Project Description: Residential Remodel: Changeout (13) windows, like for like
Living Area: Number of Stories:
1 Valuation: 1,049.00
Garage Area:
Construction Types: N/A
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit: 294.14
People Associated with Project:
Contractor HOME DEPOT U S A INC DBA THE HOME DEPO P O BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA, GA 9280
Permit Applicant Kevin Boyle
Owner HIGGINS, RONALD R JR TR 992 S SEDONA LN
Type Electrical Fixtures Oty Type Plumbing Fixtures
Oty Mechanical Fixtures Oly
The permit shall expire by limitation and become null and void lithe building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�f,NEIM cqt
Cityof Anaheim o�— ��\o
Building Division ?
'i
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwmg applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg Ele.. Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter- Meter mll be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
i Do not backfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service