281 N PASEO PICARO (2)Permit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2024-03691
Issued: 07/1812024
www.anahemn.net/building
(714)765-4626
Quarter Section: 196
Site Address: 281 N PASEO PICAROAnaheim, CA 92807
Legal Description: N TR 8081 BLK LOT 28
APN: 35821228
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Project Description: Residential Remodel: Mechanical and Electrical upgrades for kitchen remodel with 200amp main panel upgrade
Living Area: Number of Stories: 0 Valuation.
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Contractor AMERICAN FAMILY CONSTRUCTION & R 54 BRINDISI IRVINE, CA
Permit Applicant Gabiel Odisho
Owner DENNEWILL, JAMES 281 N PASEO PICARD
65,000.00
N/A
211.45
Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Meter/Disc Sw - Under 600 V, up to 200 1 Ventilation Fan - <= 300 cfm on single duct i
amps
Receptacle, switches, lights 8
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNN"Elsf cqt
Cityof Anaheim O� iO
Building DIVISIOn ' ?
V >
• 'OVNDEO tsR^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
1 I 1'{
— 6wt*
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5163)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembrene Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
L'-N
Rough Electrical
S "
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
h, I
/
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless ginned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service