Loading...
281 N PASEO PICARO (2)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2024-03691 Issued: 07/1812024 www.anahemn.net/building (714)765-4626 Quarter Section: 196 Site Address: 281 N PASEO PICAROAnaheim, CA 92807 Legal Description: N TR 8081 BLK LOT 28 APN: 35821228 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Residential Remodel: Mechanical and Electrical upgrades for kitchen remodel with 200amp main panel upgrade Living Area: Number of Stories: 0 Valuation. Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Contractor AMERICAN FAMILY CONSTRUCTION &AMP; R 54 BRINDISI IRVINE, CA Permit Applicant Gabiel Odisho Owner DENNEWILL, JAMES 281 N PASEO PICARD 65,000.00 N/A 211.45 Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Meter/Disc Sw - Under 600 V, up to 200 1 Ventilation Fan - <= 300 cfm on single duct i amps Receptacle, switches, lights 8 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNN"Elsf cqt Cityof Anaheim O� iO Building DIVISIOn ' ? V > • 'OVNDEO tsR^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final 1 I 1'{ — 6wt* Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5163) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrene Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical L'-N Rough Electrical S " Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction h, I / Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless ginned off) Sewer Water Engineering Backflow (Testable Only) Water Service