1888 S WESTSIDE DR 60Permit Types
BLD I ELE I MEC PLM
X
r'ermit Number: BLD2024-05817
Issued: 11/01/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 108
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
17141765 -5153
Site Address: 1888 S WESTSIDE DR 60, Anaheim, CA 92805
Legal Description: N TR 17703 BLK LOT 7 UN 60 LOT 7 OF TRACT 17703 OF
APN: 93897845
Project Description: Electrical EV Charger Level 2
Living Area:
Garage Area:
Camort Area:
Balcony I Deck Area:
Cool Roof:
Number of Stories:
0 Valuation:
Construction Types:
Occupancy Groups:
Fire Spnnklered:
Total Fees paid for permit:
People Associated with Project:
Contractor EVIVIE LLC 2082 MICHELSON DR STE 100 IRVINE, CA
Permit Applicant Sameer Devil 2082 Michelson Dr Suite 100 Irvine, CA 92612
Owner HAU DAVID 1888 S WESTSIDE DR #60
0,00
NIA
177.00
Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Qty
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
PNPNEIMC
City of Anaheim OQ iO
Building Division z
v 5
aOGNCO `�S
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
`� h
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms[Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 766-5153)
last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Met; & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service