Loading...
123 E ELLSWORTH AVE (4)Pennrt lypes _ _ .'- BLD ELE MEC r.M Li t Y OF ANAHEIM ! X -- X BUILDING DIVISION Permit Number: BLD2023-02440 200 S. ANAHEIM BLVD. Issued: 05/18/2023 (714) 765 - 5153 www.anaheim.neUbuilding (714)7654626-- Quarter Section: 84 Site Address: 123 E ELLSWORTH AVE, ANAHEIM, CA 92805 Legal Description: N TR 497 BLK LOT 7 TR 497 LOT 7 POR OF LOT AND LOT APN: 25108414 Project Description: Site Work: Construct 17 In it X 8ft high block wall to match existing, relocate 8 It high swing gate, install (4) light poles, new concrete slab for water treatment equipment. REF: BLD2022-05244 LMng Area: Number or Stones: 0 Valuatio, Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered. Cool Root Total Fees paid for Parma: 3,774,720A0 VB No 2,662,92 People Associated with Project: Contractor C D M CONSTRUCTORS INC 555 17TH STREET STE 500 DENVER, CO 80202 Permit Applicant Nona Jesmani Owner CITY OF ANAHEIM 201 S ANAHEIM BLVD 7TH FL Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty Pole Light 4 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�N"EIM cq` FINAL INSPECTIONS City of Anaheim i� All applicable items below must be signed before utilities are released D O Building Division f z u a �DUNDED tsh^ Do not occupy this building until the final inspections have been made. Final Gas Test Electrical Final Plumbing Final Mechanical Final iioa Cross Connection Control (714) 765-4280 Engineering Final (714) 766-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer 11 Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footing COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections 7N (J\,L S \_Qa7_/— 8 v ­ Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg . Ele , Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections 'co Ag, Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New S Exterior Plaster (Brown Coat) ,1 a&6A,2q D°V T-Bar (Struct., Ele., or Mec.) J Grease Interceptor (no nor hankfid unless sinned offl Sewer Water Engineering Backflow (Testable Only) Water Service