Loading...
780 S RIDGEVIEW RDPermit Types BLD ELE MEG: PLM X X X X Permit Number: BLD2024-04547 Issued: 08/29/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 205 Site Address: 780 S RIDGEVIEW RD, Anaheim, CA 92807 Legal Description: N TR 9215 BLK LOT 13 APN: 36537204 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 :�ti DIM Cq � 0 1 2 Project Description: Residential Remodel: Bathroom remodel, replace (1) shower with tile surround, with electrical, mechanical, and plumbing fixtures Living Area: Number of Stones: 0 Valuation', Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area Fire Spdnklered: Cool Roof: Total Fan paid for Parmk: People Associated with Project: Contractor CA KITCHENS FLOORS &AMP; BATHS INC 1340 S CLAUDINA ST ANAHEIM, CA 92806 Permit Applicant Mary Koshkenan Owner YEAGER, BRADLEY NELSON TR 780 S RIDGEVIEW RD 21,000.00 VB 294.73 Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Mechanical Fixtures Qty Receptacle, switches, lights 8 Shower 1 Ventilation Fan - <= 300 cm on single duct 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. T3" V �NElhf O Cityof Anaheim C C'�O Building Division ti Z u > �DVNDED t$q^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Q3Oft- Mechanical Final ( - Cross Connection Control (714) 765.4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7665041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-6194 (Allow 10 business days) SetbacklForms/Trenches (Footings) COA/Migation Measures Do not install subfioor or pour Floor slab until the follwing applicable items have been sianed Building Final (714765-5153) Last Inspection -Final Only After Above Completed ll/I 1� Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been soned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) ( y Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbin Ins actions g FYI y yarmegf - JSG Framing (Only after Plbg., Ele_ Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath q I? r J SG Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New rnrintriprfinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service