Loading...
623 N LEMON STPermit Types CITY OF ANAHEIM ELE MEC PLM X BUILDING DIVISION Permit Number: BLD2024.03579 200 S. ANAHEIM BLVD. Issued: 07/15/2024 (714)765-5153 www.anaheim. net/bu ilding (714)7654626 Quarter Section: 71 Site Address: 623 N LEMON ST, Anaheim, CA 92805 Legal Description: N TR 170 BLK B LOT 6 APN: 03426414 Project Description: Patio Cover: 138 sq. ft. covered porch. Living Area: Number of Stories: 0 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area Fire Sprinklered: Cool Root Toral Fees paid for Permit: People Associated with Project: Permit Applicant Lucile Gamez Owner GAMEZ, LUCILA 623 N LEMON ST 10,000.00 NIA 551.30 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. V,, 1 P�PH EIM CqC .. / ity of Anaheim O4 io Building Division z • opNp Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) ,�,. G COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed pJ t (J I �I Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/DiaphragmlFrame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele.. Mec. & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service