Loading...
602 S AMBOY ST (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-06191 Issued: 11/22/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 55 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (716) 765 •5153 Site Address: 602 S AMBOY ST, Anaheim, CA 92802 Legal Description: N TR 2381 BLK LOT 34 APN:25007308 Project Description: Reroof: Remove existing to install (25) sq of composition shingles over entire house and attached garage Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: vB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spdnklered: Cool Roof: Total Fees paid for Pertnk: 351.82 People Associated with Project: Permit Applicant Henry HVu 602 S Amboy St. Anaheim, CA 92802 Owner VU, HENRY HUY 602 S AMBOY ST Type Electrical Fixtures oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PahNEIM �q< Cityof Anaheim o4 iO Building Division F i v > �OVNDEE) tad^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714765-5153) Last Inspection -Final Only After Above Completed p I Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildin Inspections ,j ('(S�� 1 j ��%NU✓ p�y� Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) sw Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) •� Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service a