Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
290 N ROSE BLOSSOM LN (2)
Permit Types BLD ELE MEC PIE: x x Permit Number: BLD2024-05688 Issued: 10/23/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 185 CITY OF ANAHEIM Site Address: 290 N ROSE BLOSSOM LN, Anaheim, CA 92807 Legal Description: N TR 16254 BLK LOT 1 APN:35833120 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Project Description: Residential Photovoltaic System - Microinverters (without ESS) Living Area: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: Number of Stones: OYvhM Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: People Associated with Project: Contractor SUNERGY INC 18 RANCHO CIR LAKE FOREST, CA 92653 Permit Applicant Chris Hammerslone 23182 ALCALDE DR STE G Laguna Hills, CA 92694 28,350,00 177 00 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City Microlnverter 29 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �Nr,HEIAl �'( City of Anaheim O4 iO Building Division L 10 i > �OVNDED `a�^. Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub LISUBus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormslTrenches (Footings) I JCOAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Pibg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Pill Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow, (Testable Only) Water Service Will a am main electrical service upgrade over 225 amps be installed and approved prior to this proposal? ❑ Yes IR No Solar PV Standard Plan —Simplified Central/String Inverter Systems for One- and'IWo-Family Dwellings 9. Single -Inverter Line Diagram Drawing here I SFB1(��M_ WI___CllJl�SN 9�livn..^µ �' .. s.n.Z...w.1O V a a K E. CTRW.^L SINGLE LIME DMGRAM 4 aiNGLE carve m xx� PVd �' 9 A «n'LOQ a »'w awe e , mao «mom mo , )R j- : SnG B��e �© \00, �e LU ,0 (\\ . r� � z m s § ((}\} :- /\... �!)| emm; 3'' Yt:4MV1Y'u.alw RAM k%%VHs sD skis LL . CRA msp M s .. _ ..., ROOF MAN N17N MWD10.Eo