Loading...
943 S NUTWOOD ST (3)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-02390 Issued: 08/15/2023 www.anaheim.net/building (714)7654626 Quarter Section: 41 Site Address: 943 S NUTWOOD ST, Anaheim, CA 92804 Legal Description: N TR 2426 BLK LOT 21 APN: 12830226 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 PN PNEt �.-t; Lli . _ Project Description: Residential Remodel: Remove (2) non -load bearing walls, Inhll kitchen door and relocate yard access by removing window and replace it with french doors. Living Area: Number of Stories: 1 Valuation: 040 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area. Fire Spnnklered: Cool Roof: Total Fos paid for permit: 1,935.50 People Associated with Project: Owner Has & Younggwang Jung 943 S. Nutwood St. Engineer- Civil JIANHUA B WAN 9456 FERNBURY ST201506081057347450 CYPRESS, CA 90630 Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. r�f.FtE"A Cat Cityof Anaheim O� io Building Division f y s SOUNDED'I Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4260 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subftoor or pour floor slab until the follwing applicable items have been soned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed U. 1849 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele-, Mec & Fire) t Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service