777 W KATELLA AVE 420-431Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-04998
Issued: 10/09/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 76
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Site Address: 777 W KATELLA AVE 420431, ANAHEIM, CA 92802
Legal Description: S TWP 4 RGE 10 SEC 22 T4 R10 SEC 22 POR OF W 112
APN: 08219027
Project Description: DCA - Golden Vine Winery/Little Mermaid/Grizzley River - Food and Wine Festival '24 - Miscellaneous: Install (5) food
kiosks, (2) refrigerators and (1) pergola. (Install 11-04-24 thru 2-16-24)
Living Area: Number of stones: 0 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered.
Cool Roof: Total Fees paid for Pennx:
People Associated with Project:
Owner WALT DISNEY PARKS AND RESORTS US INC PO BOX 313
S-to
50,000.00
NA
No
997.00
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Cry
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PHPNEIM Cd
Cityof Anaheim & < iO
Building Division _� z
u >
�o�Noep yV1,
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the followng applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklFormslTrenches(Footings)
J
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionlMembrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or
Grease Interceptor
(Do not packfill unless soned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service