220 N SUNKIST ST (4)Permit Types
BLD
ELE
MEC
PLM
x
x
Permit Number: BLD2019-05659
Issued: 11113/2019
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 122
Site Address: 220 N SUNKIST ST
Legal Description: N TR 2767 LOT 2
Project Description: Patio Cover: 258 sq ft solid cover patio with electrical.
Patio Area:
People Associated with Project
258
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIMt3LVD.
(714) 765 - 5153
Valuation: $5,600.00
Constmcion Types: NIA, ,
Total Fees paid for Permit: 649.60
Owner GEORGE P BODNAR 331 S ROSE ST ANAHEIM CA 92805-4145
Engineer CLIFF P HATTAR 13990 BARNETT LN EASTVALE CA 92880 0000
Permit Applicant OSCAR MEDINA
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Receptacle, switches, lights
3
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
PNf,NEIM cq<
Cityof Anaheim Ok !�D
Building Division i
�OVNDED t4�^
Do not Occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 76 5041 -
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591., \�
-
Electrical Ground Electrode/Ufer
A
Sub Llst/Bus. Lic. (714) 765 94"()Urow TUYusiness days)
Setback/Forms/Trenches (Footings)
r /q ig
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable ilem ave been
smined
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mac.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service