Loading...
220 N SUNKIST ST (4)Permit Types BLD ELE MEC PLM x x Permit Number: BLD2019-05659 Issued: 11113/2019 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 122 Site Address: 220 N SUNKIST ST Legal Description: N TR 2767 LOT 2 Project Description: Patio Cover: 258 sq ft solid cover patio with electrical. Patio Area: People Associated with Project 258 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIMt3LVD. (714) 765 - 5153 Valuation: $5,600.00 Constmcion Types: NIA, , Total Fees paid for Permit: 649.60 Owner GEORGE P BODNAR 331 S ROSE ST ANAHEIM CA 92805-4145 Engineer CLIFF P HATTAR 13990 BARNETT LN EASTVALE CA 92880 0000 Permit Applicant OSCAR MEDINA Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 3 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNf,NEIM cq< Cityof Anaheim Ok !�D Building Division i �OVNDED t4�^ Do not Occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 76 5041 - Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591., \� - Electrical Ground Electrode/Ufer A Sub Llst/Bus. Lic. (714) 765 94"()Urow TUYusiness days) Setback/Forms/Trenches (Footings) r /q ig COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable ilem ave been smined Building Final (714 765.5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mac.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service