289 S BROOKSIDE CT (4)Permit Types
BLD 1 EL E MEC PLM
X
Permit Number: BLD2022-01699
Issued: 04/20/2022
www.anaheirn.net/building
(714)765-4626
Quarter Section: 219
Ske Address: 289 S BROOKSIDE CT, ANAHEIM, CA 92808
Legal Description: N TR 10984 BLK LOT 140
APN: 35403311
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
4714) 765 - 5153
Project Description: Residential Remodel: Replace (10) retrofit windows and (4) patio doors
Living Area:
Number of Stones:
1 Valuation:
31.452.84
Garage Area:
Construction Types:
NIA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
No
Cool Root:
Total Fees paid for Pennk:
314,09
People Associated with
Project:
Contractor
HOME DEPOT USA INC DBA THE HOME DEPO
P O BOX 105451 ATTN LICENSE MANAGEMENT 200408130950507570 ATLANTA, GA 928C
Permit Applicant
Kevin Boyle
Owner
BENNETT THELMA TR
289 S BROOKSIDE CT
Type Electrical Fixtures Cry Type Plumbing Fixtures City Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
��NliefAt ��`
Cityof Anaheim O� iO
Building Division Z
U >
�ovNDED ts�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final -
r--�-,-r
Cross Connection Control (714) 765.4 80
Engineering Final (714) 765.512)6 r
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Z
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4691
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
saided
Building Final (714 765-5163)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1 at Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele.. Mob. 8 Fire)
Insulation(Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service