325 S ANISE STPermit Types
BLD
ELE
MEC
PLM
X
X
X
Permit Number: BLD2022-01438
Issued: 04/04/2022
www.anaheim. net/build ing
(714)765-4626
Quarter Section: 214
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 - 5163
Site Address: 325 S ANISE ST, ANAHEIM, CA 92808
Legal Description: N TR 10981 BLK LOT 65
APN: 35412407
Project Description: Residential Remodel: Remodel at bathroom to change out shower with acrylic walls. With plumbing and electrical.
Living Area: Number of Stones:
0 Valuation: 6,400.00
Garage Area:
Corisbrrc9on Types: VB
Carlwrt Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Tolal Fees paid for Psrmx: 21643
People Associated with Project:
Contractor REBORN CABINETS DBA REBORN BATH SOL 5515 E LA PALMA AVENUE STE 250 ANAHEIM, CA 92807
Permit Applicant Emily Batiofi
800 Hopper Ave. Santa Rosa, CA 95403
Owner WEBER DONALD G TR
325 S ANISE ST
Type Electrical Fixtures Qty Type
Plumbing Fixtures Qty Mechanical Fixtures Qty
Receptacle, switches, lights 1 Shower
1
The permit shall expire by limitation and become null and Vold N the building or work has not passed final inspection 365 days lean the
data of permit Issuance. A new permit Is required to commence or continue work.
City of Anaheim P�PNEIAI-
O� ,r
Building DIVISIOn t: `z
r1
0�NOE6.��'�1^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7(ifi44282
Engineering Final (714) 765-5126
INSPECTION
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5 4
Do not pour concrete ,,> ;he following applicable items have been signed:
Fire Dept. Final (714) 765-5041 1 C
i )—
t
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765-5j, JoFP10 busi ess ais)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable hems have
been sioned
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
510122
.22
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mee. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service